Fort Myers, Florida
Rack-level circuits that bill, charge and dispatch
A 420-vessel indoor dry stack added rack-level bidirectional circuits, billing maintenance charging by the kilowatt-hour and dispatching stored packs during hurricane-season peaks.
30 minutes, no cost — pick a time after a few property questions.

Scale
420 rack positions
Service
Three-phase, rack-level branch circuits
V2G enabled
96 rack-level bidirectional circuits
The starting point
- Maintenance charging for stored electric vessels was unbillable and quietly growing.
- Rack rows had no individual circuits, so nothing could be measured or controlled.
- The facility needed backup for its stacker and fire system during storm season.
The build
Phase 1
Rack circuit retrofit
Ninety-six rack positions received individually metered branch circuits during the summer slow season.
Phase 2
Billable maintenance charging
Owners are billed per kilowatt-hour for top-offs, turning a cost center into a margin line.
Phase 3
Peak dispatch
Stored packs above their owner floor are dispatched into afternoon peaks with no impact on retrieval readiness.
Phase 4
Storm hardening
The stacker, fire pump and building controls sit on an islandable bus backed by aggregated rack capacity.
Results
$71k
Combined billed charging and program revenue, year one
29%
Facility peak demand reduction
6 hrs
Stacker and fire system runtime during grid loss
Measured outcomes
Measured against a twelve-month pre-V2G baseline at Riverbend Dry Stack.
| Metric | Before | After V2G | Change |
|---|---|---|---|
| Maintenance charging | Absorbed cost | $38,000 billed / yr | cost center to margin |
| Facility peak demand | 735 kW | 522 kW | -29% |
| Metered rack positions | 0 of 420 | 96 of 420 | +96 circuits |
| Stacker runtime in grid loss | 0 hrs | 6 hrs | +6 hrs |
Key project metrics
- Annual value
- $71,000 billed charging plus program revenue
- Capital required
- $164,000 retrofit, 60% offset by utility incentives
- Payback
- 14 months on the facility's share
- Time to value
- 1 slow season for the 96-circuit retrofit
Want these numbers modeled for your own indoor dry stack with rack-level circuits? We build the baseline from one utility bill.
Model my property"We were eating the charging cost for every electric boat in the building. Now every rack meters, bills and pays us back."
Share this outcome
A ready-to-post card with the headline result and property type.
GridLinq
Boat storage$71k combined billed charging and program revenue, year one
Riverbend Dry Stack — Fort Myers, Florida
1200×630 card, sized for LinkedIn and X previews.
Boat storage facility
Request a proposal
Get a written scope and economics modeled on this indoor dry stack with rack-level circuits build for your own property.
Ready to see this on your property?
Book a 30-minute assessment call. We review your service capacity, dwell time and utility programs, then map the same build for Riverbend-style sites.
Schedule my assessment callNot sure yet? Check your V2G eligibility first