Stamford, Connecticut
Common-area backup paid for by resident batteries
A 190-unit waterfront association put resident EVs and slip-side tenders behind a common-area microgrid that carries elevators, pumps and hallway lighting through outages.
30 minutes, no cost — pick a time after a few property questions.

Scale
190 units, 62 garage bays, 24 slips
Service
Two 1200A house services, garage subpanel rebuild
V2G enabled
62 bidirectional garage bays + 24 dock pedestals
The starting point
- Common-area electricity was the association's fastest-growing expense with no lever to control it.
- A diesel generator covered only the fire pump and one elevator, and failed its last two load tests.
- Residents were installing chargers ad hoc, threatening garage service capacity.
The build
Phase 1
Garage subpanel rebuild
Ad hoc charger runs were replaced with a managed subpanel so every bay shares capacity instead of racing for it.
Phase 2
Owner opt-in terms
Residents set a reserve floor and receive a monthly common-charge credit for capacity made available to the association.
Phase 3
Common-area dispatch
Aggregated capacity is dispatched against house-meter peaks before any export, cutting demand charges on both services.
Phase 4
Backup mode
Elevators, fire pump, hallway lighting and dock power transfer to stored capacity automatically when the grid drops.
Results
34%
Common-area demand charge reduction
11 hrs
Elevator and life-safety uptime in the last outage
$27/mo
Average common-charge credit to participating owners
Measured outcomes
Measured against a twelve-month pre-V2G baseline at Lighthouse Point Residences.
| Metric | Before | After V2G | Change |
|---|---|---|---|
| Common-area demand charges | $88,000 / yr | $58,100 / yr | -34% |
| Generator load tests failed | 2 of 2 | 0 — generator retired | -$9k service |
| Life-safety outage runtime | 3 hrs (diesel) | 11 hrs (stored) | +8 hrs |
| Owners enrolled | 0 | 48 of 62 bays | 77% opt-in |
Key project metrics
- Annual value
- $29,900 avoided demand charges plus retired generator service
- Capital required
- $0 special assessment — funded from reserve offset
- Payback
- 21 months against reserve contributions
- Time to value
- 16 weeks including garage subpanel rebuild
Want these numbers modeled for your own condominium association, garage + common-area backup? We build the baseline from one utility bill.
Model my property"The generator only ever covered the minimum. Resident batteries now carry the elevators and the hallways, and the board's power bill went down doing it."
Share this outcome
A ready-to-post card with the headline result and property type.
GridLinq
Condo associations34% common-area demand charge reduction
Lighthouse Point Residences — Stamford, Connecticut
1200×630 card, sized for LinkedIn and X previews.
Waterfront condominium
Request a proposal
Get a written scope and economics modeled on this condominium association, garage + common-area backup build for your own property.
Ready to see this on your property?
Book a 30-minute assessment call. We review your service capacity, dwell time and utility programs, then map the same build for Lighthouse-style sites.
Schedule my assessment callNot sure yet? Check your V2G eligibility first