Charleston, South Carolina
Association-owned slips that lower everyone's dues
An owner-association marina with 140 annual slips. V2G capacity now offsets common-area demand charges and backs up the clubhouse during hurricane season.
30 minutes, no cost — pick a time after a few property questions.

Scale
140 annual slips
Service
Mixed 50A, phased pedestal replacement
V2G enabled
58 bidirectional pedestals
The starting point
- Common-area electrical costs were rising faster than the association could raise dues.
- Legacy 30A pedestals could not support the members already arriving with electric tenders.
- Hurricane-season outages left the clubhouse and dock lighting dark for days.
The build
Phase 1
Phased pedestal replacement
Pedestals were replaced dock by dock over two off-seasons so no member lost shore power for a full season.
Phase 2
Member opt-in
Slip holders opt in per vessel and choose their own reserve floor, with revenue split between the owner and the association.
Phase 3
Demand offset
Aggregated discharge is dispatched against the association's own peak window before any grid export is considered.
Phase 4
Storm mode
A single switch puts the clubhouse, pumps and dock lighting on stored vessel capacity ahead of a named storm.
Results
$0
Dues increase in three consecutive years
31%
Common-area demand charge reduction
2 days
Clubhouse uptime through a hurricane outage
Measured outcomes
Measured against a twelve-month pre-V2G baseline at Harbor Landing Marina Club.
| Metric | Before | After V2G | Change |
|---|---|---|---|
| Common-area demand charges | $54,800 / yr | $37,800 / yr | -31% |
| Annual dues per member | $3,240 | $3,240 | flat 3 years |
| Member vessels able to charge | 12 of 140 | 58 of 140 | +46 slips |
| Clubhouse outage coverage | 0 hrs | 48 hrs | +2 days |
Key project metrics
- Annual value
- $17,000 avoided cost plus $21,000 shared revenue
- Capital required
- $0 special assessment — phased from operating budget
- Payback
- 18 months across two off-seasons
- Time to value
- 2 off-seasons to full pedestal replacement
Want these numbers modeled for your own condominium marina with annual slips? We build the baseline from one utility bill.
Model my property"Our board wanted resilience and our members wanted charging. The same pedestals delivered both, and the revenue share made the vote easy."
Share this outcome
A ready-to-post card with the headline result and property type.
GridLinq
Condo associations$0 dues increase in three consecutive years
Harbor Landing Marina Club — Charleston, South Carolina
1200×630 card, sized for LinkedIn and X previews.
Waterfront condominium
Request a proposal
Get a written scope and economics modeled on this condominium marina with annual slips build for your own property.
Ready to see this on your property?
Book a 30-minute assessment call. We review your service capacity, dwell time and utility programs, then map the same build for Harbor-style sites.
Schedule my assessment callNot sure yet? Check your V2G eligibility first